Mini skip
There are a lot of different ways to get rid of rubbish. Trailer bins are on one option; mini skips hire is another. There are several categories of the kind of waste you have to dispose of, that you must segregate appropriately before putting it out where the waste disposal truck can take it away. This makes their job easier. So there are categories like bio-degradables, plastics, toxic or hazardous waste, construction or building materials, fluids, etc.
When you have more than the daily waste to get rid of, putting it all somewhere can become problematic. This could be on days that you are moving into a new residence, when you suddenly realise you don't need all that old furniture and so on. Or it might be during a spring cleaning when there's always more than you realised you had or needed. If you have a new job or a new person in your life, it can be time to make more space. Sometimes we just have a new idea of ourselves and need a new environment and new possessions to make this happen.
You can get a rent-a-trailer, but these are charged by the hour. Instead, hiring a mini skip makes a lot more sense. Mini skips are jumbo skip bags that can be unfolded and are used for loading and packing away a large bulk of rubbish. Up to 1.5 tons of rubbish can be loaded into these mini skip jumbo bags. They are easy and convenient to use. They can be unfolded when you need them, so don't work on the rent by hourly rates. They simply get picked up and dropped off by the company that you have hired them from.
They can remove up to 3 sq. m of rubbish. They are environment-friendly and recycle almost all the waste that is collected.
Hazardous waste cannot be placed in mini skips. This includes TVs, monitors, fridges, paints, solvents, liquids or any asbestos. To dispose of any of these materials you will need contact your local council.
They will be able to provide you with a contact who can dispose of anything hazardous or not accepted in your skip bin (i.e. food waste). In some areas, disposal of tyres and mattresses in the skip bin can incur additional charges. Your supplier will be able to advise you of such costs.
Skip bins should not be filled any higher than the top of its sides and should be filled in such a manner as to prevent spillage of material from the skip bin either while stationary or in transit. If unforeseen circumstances mean that you have not finished with the skip bin, you should advise the supplier as early as possible.
There are various types of rubbish removal bins, like, mini, midi and standard sizes. Ensure the size you choose will fit on your driveway, in the road outside your house, or wherever you want the mini skips to stand. You need a skip permit to put a mini skip on the road; double-check that the skip hire company has this covered.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.